Sauna BalikpapanPlan my build
SystemsPricingCoverage mapSite recordsBlogAboutContact

Pricing

Sauna and ice bath estimates for Balikpapan

Every sauna price band on this page already has sea freight folded in — three to four days on the water from Surabaya — plus fitting by our own crew out of the Balikpapan Selatan workshop. Custom sauna IDR 60-120 million, modular IDR 15-35 million, infrared IDR 30-70 million, steam room IDR 50-100 million, cold plunge with chiller IDR 45-90 million. The number becomes a fixed RAB once the free survey is done; Samarinda, Bontang and Nusantara carry an added technician-travel line.

Saunas and steam rooms

ConfigurationRupiah rangeTurnaround
Four-person custom sauna, 2x2 mIDR 60-120 million2-4 weeks
One or two person modular unit, delivered and fittedIDR 15-35 million1-3 days
One or two person infrared cabinIDR 30-70 million1-2 days
Turnkey 2x2 m steam roomIDR 50-100 million3-5 weeks
Budget cabin, mixed-material buildfrom IDR 40 million2-3 weeks
Two-person pinewood cabin, 1.5x1.2 m, 3.6 kW on 5,500 VAIDR 55-70 million2-3 weeks
Red cedar cabin for four, 2x2 m, 6 kW on 7,700 VAIDR 75-95 million2-4 weeks
Thermowood cabin for six, 2.4x2 m, 8 kW on 11,000 VAIDR 110-150 million3-4 weeks
Eight-person cabin, 3x2.4 m, 9 kW on 11,000 VAIDR 150-200 million4-6 weeks
Three-phase cabin for ten, 3.5x2.6 m, 10.5 kWIDR 190-240 million4-6 weeks
Three-phase cabin for twelve, 4x3 m, 12 kWIDR 230-290 million5-8 weeks
Roofed outdoor cabin, self-containedIDR 80-150 million1-2 weeks on site

Ice bath, cold plunge and wellness

ConfigurationRupiah rangeTurnaround
Timber plunge tub with a half-to-one-HP chillerIDR 45-90 million1-2 weeks
Chiller only, fitted to a tub you already ownIDR 25-55 million3-5 days
Wellness corner: sauna, plunge and jacuzzi togetherfrom IDR 250 million6-10 weeks
Crew recovery suite: eight-person sauna plus two plungesfrom IDR 250 million6-8 weeks
Accessory bundle: bucket, ladle, timer, thermohygrometer, lampIDR 1.5-8 millionwith the unit

Corporate, club and service work

ConfigurationRupiah rangeTurnaround
Commercial-grade sauna for a hotel or gymfrom IDR 150 million4-8 weeks
Twenty-person club room, 5x3.5 m, twin 10.5 kW heatersfrom IDR 300 million6-8 weeks
Refit of a sauna or steam room already in placeIDR 15-50 million1-3 weeks
Harvia heater swap, 6-9 kW, fittedIDR 15-35 million1-3 days
Strip-out and refit at a new city addressIDR 2-4 million1-2 days

These are planning figures — the confirmed RAB follows the free site survey.

Nine things that push a Balikpapan number higher or lower

  • How many people. Every extra 0.4 m of cabin length means another panel, another bench section and roughly 1 kW more on the heater.
  • Which timber lines it. Pinewood sits at the low end, red cedar in the middle, thermowood at the top and holds its shape best in this humidity.
  • Heater brand and controls. Harvia, Sawo and Tylo price differently per kW, and an app-controlled weekly timer adds a few million rupiah.
  • How much glass. Swapping an insulated panel for 8 mm tempered glass adds both the glass itself and roughly 1 kW of extra heater capacity.
  • Scope of the electrical work. Board, ELCB, SiHF cable and chiller soft-start are already in our number; only the PLN upgrade to 7,700-11,000 VA sits with the owner.
  • Whether a genset is involved. Delayed contactors and soft starters for a compound standby set are a small line item, listed on their own.
  • Modular versus fixed. Cam-lock joints and industrial connectors cost a little more up front and save the whole unit when the lease ends.
  • Distance from the sea. Titanium exchangers and stainless hardware for Batakan, Manggar and Klandasan addresses.
  • Building outdoors. Roof, pad footings, hardwood decking and stainless fittings put a self-contained outdoor cabin at IDR 80-150 million.

What it costs to keep running once it's in

On a household tariff, budget IDR 200,000-500,000 a month for a dry sauna used three or four times a week, IDR 100,000-250,000 for infrared, IDR 300,000-600,000 for a steam room with water included, and IDR 300,000-700,000 for a cold plunge depending on set point and how often the lid stays on. Run the same session off the compound genset instead and a 6 kW heater on a 10 kVA set burns roughly three to four litres of diesel for ninety minutes, warm-up included.

Upkeep follows a fixed rhythm: plunge water turned over every three or four weeks under filtration, heater stones inspected every six months and swapped every two to three years, steam generator descaled every two to three months. Our own technicians run an annual service covering the ELCB, contactors, glass seals and timber condition. Full specs live on the dry sauna, steam room and ice bath pages.

Frequently asked questions

Balikpapan's water runs hard. Does that push up what maintenance costs?

A little, over time, though not at install. Hard water is why heater stones on our quotes get replaced every two to three years rather than five, and why a steam generator on mains water needs descaling every two to three months instead of every six. It shows up later as a small annual service line, which we can quote separately if you want us to carry it.

What's actually baked into the headline number, and what lands as an extra?

Baked in: the cabin or tub, heater or chiller, wiring from the board to the unit, installation, commissioning and the two-year warranty. Extra: the PLN upgrade, civil works outside the unit itself such as a new terrace roof or a rebuilt bathroom floor, and travel beyond Balikpapan. Each of those gets its own line.

How is payment structured across a project?

Half up front once the quote and programme are approved, a second instalment when the panels are finished and ready to install, and the balance once commissioning and handover are done. On corporate jobs in Samarinda or Nusantara, stages can be tied to the main contractor's own milestones.

Will your paperwork satisfy a corporate procurement process?

It should. We provide line-item quotes built for tender comparison, load schedules, fabrication drawings and a bilingual handover file. Book the survey through the contact page and flag whatever else your procurement team needs to see.

Why isn't Balikpapan pricing identical to a Java-based contractor's quote?

It's close — the gap is roughly three to five per cent of the unit price, and all of it is sea freight on imported material through Surabaya. Panels, benches and tubs are built in our own workshop here, so there's no finished eight-cubic-metre cabin crossing the sea and no technician flown in from Java to bill for.

Get a quote

Tell us the room size and the power supply — a quote comes back within one to two working days

A room measurement and your PLN number or genset size get the process started; the compound or district helps too. Photos can follow later, over WhatsApp.

No cost, no obligation. We use your details only to put the quote together, and reply within working hours, Monday to Saturday 08:00-18:00 WITA.

Tell us the room size and what's powering it

One photo of the room and the meter board is enough for a first number. Site visits cost nothing in Balikpapan, Samarinda or Nusantara.

WhatsAppUse the form